Prepare and adjust
Remove loose residue and match the station and groove-brush position to the mold.

V-TAI / VT-CE-CM2
Focus on the residue clinging to chiffon cake ring walls. Brushes loosen it; cold water carries it away. Test your actual dirty molds to establish brush contact, cycle time and a practical loading routine.
03 / SEE THE PROCESS
Explore the supplied equipment demonstrations, from loading molds to the brushes in motion.
Load and adjust → start the cycle → wait for a complete stop → unload. Operate only after training and in accordance with the supplied manual.
VT-CE-CM2
Remove loose residue and match the station and groove-brush position to the mold.
Load only while the machine is fully stopped. Start the configured wash cycle.
Roller and plate brushes work with water spray. Keep hands clear of moving parts.
Wait until the press plate has lifted and all motion has stopped. Remove the molds and follow your sanitation process.
| Metric | Value | Unit | Basis, formula & conditions |
|---|---|---|---|
| Quick cycle | ≈15 | s | Reference value Designer and product information; handling excluded. Product sheet · p. 2Reviewed |
| Molds per cycle | 2 | molds/cycle | Documented specification Designer and product information; handling excluded. Product sheet · p. 2Reviewed |
| Rated throughput | 300–400 | molds/h | Reference value Indicative throughput. Actual output depends on soil, mold size, cycle settings and loading time. Product sheet · p. 2Reviewed |
| Operators in this arrangement | 1 | operators | Conditional arrangement Conditional designer statement; verify on site. Designer explanationReviewed |
| Machines attended per operator | 3–5 | machines/operator | Conditional arrangement Conditional designer statement; verify on site. Designer explanationReviewed |
Based on V-TAI product information and the supplied product sheet. Final configuration and sample suitability should be confirmed with V-TAI.
V-TAI · VT-CE-CM2 Download product sheet · PDF · Chinese · 2 pages